Check out this awesome aerial footage of our most recent project at Tillamook Creamery in Tillamook, OR. As part of our design-build efforts, we installed two new custom air handling units with new ductwork, heating & chilled water piping. We also performed the controls install on these units.

 

One of the more challenging aspects of the project was getting a new unit online and tied into their system within an eight-hour shutdown window. This was required as the corresponding area is the heart of their cheese production and needs 24/7 temperature control. Also, the creamery plant is considered a 'clean room' space, so extra diligence in dust and particle control was paramount.

 

Congratulations to our engineering and project teams on a beautiful job.