top of page

Portland State University
Peter Stott Center

Portland, Oregon

Alliant Systems worked with Fortis on this design assist project for PSU. Alliant was responsible for the plumbing and mechanical fitting work. This project included a new gymnasium for the Portland State Vikings, a new pavilion, locker rooms, training facilities, restrooms, and multiple new concession stands. The building achieved LEED Gold certification which resulted in a 25% reduction in annual energy costs through efficient mechanical and lighting systems and a 46% water use reduction with water-saving flush and flow fixtures.

Project Information

Design Assist

Delivery Method

2018

Completion

Higher Ed

Project Type

Project Gallery

bottom of page